The older archives (>10 years old) have been substantially recovered -- more than 23,800 files' worth -- and are now reachable through the search engine and via file download. Email here if you have any questions.
Your support is essential if the service is to continue, there are bandwidth bills to pay every month and failing disk drives to replace. Volunteers do the work, but disk drives and bandwidth are not free. We encourage you to contribute financially, even a dollar helps. Click here to donate.
Welcome to the new Radio4all website! If you cannot log in, you may need to reset your password. Email here if you need additional support.
 
Program Information
Grassroots Environmental Protection Radio
Actuality (Uncut Material)
US Environmental Protection Agency employees on the call include: Larisa Romanowski, Anne Kelly, Joel Singerman, Douglas Fisher, Marian Olsen, PhD and Michael McGowan; Cancer Action NY Director Donald L. Hassig
 Cancer Action News Network  Contact Contributor
July 19, 2014, 1:06 p.m.
On 7/15/14, scientists and technical personnel employed by the US Environmental Protection Agency (EPA) participated in a Cancer Action NY teleconference for discussion of minimization of PCB exposure associated with the General Motors Powertrain Superfund Site in the
Town of Massena, New York. EPA employees on the call included: Larisa Romanowski, Anne Kelly, Joel Singerman, Douglas Fisher, Marian Olsen, PhD and Michael McGowan.

Discussion centered upon PCB evaporation from the Industrial Landfill referred to by Akwesasne residents as the "Toxic Mound". Anne Kelly stated that EPA planned to remove the most heavily contaminated materials from the Industrial Landfill and the East Disposal Area, consolidate the remaining materials and then place a permanent cap
over the area. Ms. Kelly explained that the new cap is designed to prevent all evaporation of PCBs.

Respiratory PCB exposure has significantly contributed to the causation of diabetes on the Akwesasne Reserve. This has been clearly elucidated by the research of David O. Carpenter, MD. Capping areas of PCB contamination so as to prevent all evaporation is a critical part of minimizing ongoing exposure to these harmful chemicals. Where any PCBs remain on the GM Superfund Site there must be effective capping. Air quality monitoring must be utilized to insure that capping stops PCBs from escaping containment.
Donald L. Hassig, Director
Cancer Action NY
Feel free to rebroadcast. Please credit as above.

Download Program Podcast
00:39:27 1 Jan. 1, 1
  View Script
    
 00:39:27  128Kbps mp3
(19MB) Stereo
721 Download File...